1800 975 307

Download our Powerline Height Management Case Study

New Approach Used at Australian Mine

Major  Australian  Mine  Demonstrates  a  New  Best-Practice  Approach  to  Documenting  Aerial  Powerline  Heights  Above  Travel  Paths  Across  Entire  Site

This case study looks at how a major Australian mine is taking a new approach to track and manage the heights of aerial powerlines above travel routes. The site is now demonstrating what is arguably best-practice documentation of powerline heights, made possible through a Gridvision aerial powerline inspection that took just 2 days to capture data covering 100% of the network. Gridvision partnered with Waterline to produce an outstanding result for the client.

Enter your details below to download the case study and learn more about:

  • Managing conductor clearances over travel routes
  • The benefits and process of inspecting from the air
  • Best-practice management of powerlines above travel routes that is now being utilised at a major Australian mine

[hubspot type=form portal=7606646 id=f077263a-e0d8-41f8-b450-acf9f31ea27b]